Project / Scope of Work: EB Galaxy provided General Construction Management and Supervision Services

E.B. Galaxy furnished all labor, materials, tools, equipment, supervision, etc. necessary for the renovation of Prosthetics clinical area, lab and Pharmacy storage. Work will include but not be limited to: temporary enclosure during construction, doors and hardware, acoustical/gyp board ceilings, sheet vinyl, solid surface wainscot, cabinetry, HVAC, fire protection, electrical, plumbing and painting as described in the drawings and specifications. All work was performed in five (5) phases. Some work (approximately 50-75%) was performed during evening hours or weekends to avoid disruption of the Unit. The Unit remained open during construction

Contact/Reference: Robert Tates
Architect/Engineers: Robert Shackelton and Boy